
In mechanical and electrical construction, the system-wide pressure testing phase is when defects at pipe joints are most apparent. Even a small leak can necessitate dismantling and reinstalling the piping, incurring additional costs and impacting construction schedules. Therefore, pipe end treatment is not simply a matter of tightening, but rather creating a tight and stable connection from the very beginning, starting with the material structure.









